The existing sewage treatment plant at Gedney Hill school was a filter bed system that had failed. The scope of works included: 

  • The design of a new sewage treatment plant system
  • The demolition of the existing filter bed and associated holding tanks
  • Installation of a WPL Hy-Paf sewage treatment plant
  • Installation of inlet and outlet pipework
  • Installation of a new head wall within the dyke area
  • Installation of a blower system control panel and sound proof kiosk
  • Graveling of area around the sewage treatment plant
  • Commissioning and testing
Refurbishment of Sewage Treatment Plant