The existing Flygt pumping station serving Team Diner had major issues with broken pipework causing the system not to work on automatic control. We removed all of the existing equipment within the wet well and the control panel. Engineers carried a full installation of all pipework, valves and two Flygt 3067 submersible pumps. A new control panel and kiosk were relocated adjacent to the pumping station.

June 2018